← Back to site
Production floor — live
Day shift · plant: Bay of Plenty · 4 lines · 2 shifts
--:--:--LIVE · PRODUCTION
i Example layout — not your final dashboard. Your live Synk hub is shaped around your team: the panels, metrics and tabs you actually use. This sample shows the kind of views a production plant runs — yours are built to your site and your workflows. Click the menu on the left to explore.
Units produced today
0
target 24,000 · on plan
Throughput
0
units / hr · avg
First-pass yield
0
within spec tolerance
OEE
0
▼ 1.4% vs 7-day avg
Output by line todayunits by line
Line 1 · forming6,420
Line 2 · assembly5,180
Line 3 · finishing4,260
Line 4 · packaging3,540
Rework cell280
Live line statusnow · per line
LineSKURateStatus
Line 1 · formingSKU-220412 /hrRunning
Line 2 · assemblySKU-220360 /hrRunning
Line 3 · finishingSKU-118298 /hrInvestigate
Line 4 · packagingSKU-220240 /hrRunning
Rework cellmixed36 /hrManual
Rates read live off each line's controller. A line that drops below its target rate flags here and in the next scheduled shift brief.
First-pass yield
0
within spec tolerance
Checks today
0
in-line QA logged
Open NCRs
0
awaiting disposition
Rework rate
0
of units produced
In-line quality checksin-line QA
TimeLineCheckTargetActualResult
07:10Line 1Dimension±0.20 mm+0.06 mmPass
08:25Line 3Torque12.0 Nm12.9 NmInvestigate
09:40Line 2Weight500 g499 gPass
10:55Line 4Seal integritypasspassPass
11:30Line 1Surface finishRa ≤1.6Ra 1.1Pass
Open NCRsnon-conformance
NCRLineIssueOwnerStatus
#221Line 3Torque above specQuality mgrInvestigate
#219Line 4Seal mark off-centreLine leadContained
A failed in-line check opens an NCR, notifies the quality manager, and is tracked to disposition. Nothing closes without a logged sign-off — and the whole trail lands in the audit log.
Units shipped today
0
finished goods out
Orders out
0
against booked slots
On-time dispatch
0
▲ 3% vs 7-day avg
In transit
0
en route to customers
Dispatch queuelive · gate
OrderCustomerSKUQtyStatus
SO-8841Acme RetailSKU-2202,400Loading
SO-8842Bay DistributorsSKU-1181,800Staged
SO-8839NorthlineSKU-2203,000Departed
SO-8843Coastal TradeSKU-305960Queued
Shipments by destinationloads today
Auckland12 loads
Tauranga8 loads
Hamilton6 loads
Wellington4 loads
Rotorua2 loads
Tracked SKUs
0
materials & buffers
Below reorder
0
packaging stock
WIP buffer
0
work in progress
Days cover
0
at current run rate
Material & buffer levelslive
Component A68%
Component B54%
Resin tank61%
Packaging stock17% · reorder
Finished-goods buffer73%
WIP buffer45%
Reorder alertsthreshold · 20%
ItemLevelThresholdAction
Packaging stock17%20%Reorder now
Component B54%25%OK
Resin61%25%OK
Component A68%25%OK
Levels are derived from material issued against output. When stock crosses its reorder line, Synk flags it here and raises a draft purchase request for sign-off.
Documents filed today
0
briefs · packs · NCRs
Reports auto-generated
0
on schedule · by AI
Recipients updated
0
managers & owners
Awaiting sign-off
0
needs a human
Document register — todaycreated & filed
TimeDocumentTypeSourceStatus
06:00Morning production briefPDFai:morning-briefEmailed
07:30Shift 1 handoverDocuser:honeFiled
09:16WO-4471 completion packPDFsystemFiled
10:40Quality NCR #221Formuser:arohaSign-off
12:00Owner midday snapshotEmailai:owner-digestEmailed
Distribution — managers & ownerswho gets what
RecipientReceivesChannelLast sent
Plant managerShift briefs · OEE · NCRsEmail · 06:0006:00
Production leadLine output · reworkEmail + hub07:30
Quality managerQA checks · NCRsEmail on event10:40
Owner / directorDaily + weekly snapshotEmail · 12:0012:00
AccountantWO recon packEmail · weeklyMon
Each report goes to the right people on its own schedule — no one chases a spreadsheet. Recipients and timing are set once and edited here.
Edit & version historyevery change, traced · before → after
TimeActorDocumentActionBefore → After
10:42:09user:arohaNCR #221editseverity: minor → major
10:38:55ai:morning-briefProduction briefcreate— → v1 · emailed 4
09:16:30systemWO-4471 packfiledraft → filed
08:02:11user:honeShift 1 handoverupdateadded rework note
06:00:02ai:owner-digestOwner snapshotcreate— → sent to 2 owners
Synk files the documents your plant already produces — shift briefs, completion packs, NCRs — generated on a schedule or trigger, version-tracked, and pushed to the right managers and owners. Every edit is audited; the originals stay on file for manual review any time.
Auto-reconciled
0
issue ↔ work order
Work orders closed
0
today
Flagged
0
awaiting review
Avg variance
0
within ±2% tolerance
Work-order reconciliationplanned vs actual
Work order #WO-4471 · SKU-220 · 6,000 unitsall within ±2%
MaterialPlannedActualVar.
Component A6,0006,018+0.3%
Component B12,00011,964−0.3%
Resin480 kg476 kg−0.8%
Packaging6,0006,066+1.1%
Labour96.0 h96.0 h0.0%
Material issue and output read live off the line and reconciled against the work order's bill of materials. Every issue and unit logged for full traceability.
Open exceptionsneeds a human
Work orderSKUIssueVar.
#WO-4468SKU-118Packaging over BOM+3.2%
#WO-4459SKU-305Labour hours unposted
#WO-4452SKU-220Scrap over allowance+2.4%
Synk reconciles every work order against its bill of materials automatically. Only the mismatches surface here — nothing is auto-closed without a logged action.
Writes today
0
all logged with actor
By adapter
0
line · SCADA · Xero
By user
0
corrections & overrides
By AI agent
0
drafts, each traceable
Recent writesnewest first · before → after
TimeActorActionRecordBefore → After
10:02:14adapter:line-scadacreatebatch B-7741— → 480 units
09:58:41user:honecorrectWO-4471SKU-118 → SKU-220
09:55:09adapter:xeromatchPO-9920pending → reconciled
09:51:22ai:run_8f2draftNCR #221— → suggested disposition
09:47:55adapter:line-scadacreatebatch B-7742— → 512 units
09:44:03user:arohaoverridebuffer packaging19% → 17% · reorder
Every write — adapter, user, or AI — lands here with who, when, and the before/after value. This is the audit trail your hub ships with, ready before anyone asks for it.